French construction terms, in plain English.
The French terms you will come across during a project in Morocco, simply explained.
34 terms
AEP
Adduction d'eau potable (drinking water supply): the network that brings drinking water to the buildings.
Learn moreAMO
Assistance à maîtrise d'ouvrage (client-side advisory): technical advice to the project owner, from briefing to handover.
APD
Avant-projet détaillé (detailed design): the design phase in which every element is sized and the interfaces are coordinated.
APS
Avant-projet sommaire (concept design): the phase in which the construction systems are chosen and each package is given a preliminary sizing.
BAEL 91
French limit-state design rules for reinforced concrete, still widely used in Morocco for sizing.
Learn moreBilan de puissance
Electrical load schedule: calculation of the electrical power the building needs, to choose the supply contract and size the distribution.
Learn moreBIM
Building Information Modelling: a way of working on a 3D digital model that brings together the geometry and the information of the project.
See our BIM approachBureau de contrôle
Technical inspection body: an independent organisation that checks that designs and works comply with building regulations.
CCTP
Cahier des clauses techniques particulières (technical specification): the written document that describes precisely the works of each package.
Clash
A conflict between two elements from different disciplines in the model, for example a duct passing through a beam.
See our BIM approachContreventement
Bracing: all the elements (shear walls, braced bays, frames) that keep a building stable against wind and earthquakes.
Learn moreCTA
Centrale de traitement d'air (air handling unit, AHU): the equipment that filters, heats or cools air before supplying it to the rooms.
Learn moreCVC
Chauffage, ventilation et climatisation (HVAC): the package that provides thermal comfort and air quality.
Learn moreDCE
Dossier de consultation des entreprises (tender documents): drawings, specifications and bills of quantities to launch the tender on a clear basis.
Descente de charges
Load takedown: calculation of how loads travel from the roof down to the foundations, element by element.
Learn moreDQE
Devis quantitatif estimatif (priced bill of quantities): the quantities of work multiplied by unit rates, to estimate costs and compare bids.
Learn moreEP / EU
Eaux pluviales and eaux usées (stormwater and foul water): the two drainage networks, usually kept separate.
Learn moreESQ
Esquisse (sketch design): the first design phase, which analyses the site, the brief and the constraints.
EXE
Études d'exécution (construction drawings): the detailed drawings used to build, produced or reviewed before the works.
Fédération de maquettes
Model federation: combining the architect's model and those of the engineering disciplines in a single model.
See our BIM approachFerraillage
Reinforcement: the steel bars placed in the concrete; reinforcement drawings give their number, diameter and position.
Learn moreIFC
Industry Foundation Classes: an open format for exchanging BIM models, readable in any software.
See our BIM approachNote de calcul
Calculation report: the document that justifies the sizing of each structural or services element.
Learn morePlan de coffrage
Formwork drawing (general arrangement): the drawing that gives the shape and dimensions of the concrete elements: columns, beams, slabs, walls.
Learn moreProfil en long
Longitudinal profile: a section of a road or network along its route, showing gradients and depths.
Learn morePV de réception
Handover certificate: the formal record that the works are complete, with or without reservations.
Radier
Raft foundation: a continuous slab under the whole building, used when the ground is weak or water is present.
Learn moreRéservation
Builder's work opening: a hole or passage planned in the structure before the pour to let a service through.
Learn moreRPS 2000 (2011)
The Moroccan seismic building code, revised in 2011, which sets the rules for earthquake design.
Learn moreSemelle
Footing: a shallow foundation placed under a column or wall to spread the loads onto the ground.
Learn moreSynthèse
Services coordination: coordinating the networks of all packages with each other and with the structure, so they fit without clashes.
See our BIM approachTGBT
Tableau général basse tension (main low-voltage switchboard): the main electrical board from which all the building's distribution starts.
Learn moreVisa
Drawing review: the engineer's check that the contractor's construction drawings comply with the design and with good practice.
VRD
Voirie et réseaux divers (roads and utilities): the roads, car parks, drainage, water, power and telecom networks of a site.